The Ridgeway, Iver

Ashe Construction commissioned EHW to provide the Building Regulation package and detailed construction drawings for six warehouse units with mezzanine level office suites. The construction site presented some interesting problems requiring complex design solutions. By close collaboration with the contractor to ensure a swift onsite construction process, the units were completed within programme and on budget.